Regulations concerning allocation and use of train paths on available railway lines by licensed railway undertakings within timetable 2014/2015
A. MAIN TEXT
B. ANNEXES
2. Characteristics of railway infrastructure:
-
2.2A List of maximum linear loads (per 1 running meter of track)
-
2.3. Assignment of railway lines to regional departments and railway lines plants
-
2.4A.1 Guidelines on megaphone announcements and templates of announcements
-
2.5. List of railway lines not equipped with electromagnets for automatic braking
-
2.6. Assignment of railway lines to timetable construction areas
-
2.9. List of restrictions resulting from exceeding of structure gauge of railway line
3. Internal rules:
4. Lists of organisational units referred to in Network Statement:
4.3 List of branches:
-
4.3A. Railway Traffic Management Centre of PKP Polskie Linie Kolejowe S.A.
-
4.4. List of Regional Departments of Rail Protection Guard of PKP Polskie Linie Kolejowe S.A.
5A. Annulled
-
6. Application form for train path allocation, instruction how to fill it out
-
6A. Application form for access to Train Paths Request Internet System (ISZTP) – “Request & Ride”
-
7. Principles of carrying out of auction for not allocated capacity
-
10. List of positions for which permission on journey in operative driver cab will be issued